top of page
Search

Roadway and Water Line Clearing!

The area where the community road will be built has been cleared and leveled. The water lines that provide potable water to the homes will be installed in this same section of the land.


The next steps are to tap in to WAPA's main water lines, bring the tap in across the street, and then run the water lines to each individual plot.


Promptly after

the water lines have been installed, road construction will begin.




bottom of page